The following table provides a list of supported operating systems for the Intel® Server Board SHG2. Operating systems not listed below are not supported by this Intel Server Board.
| Operating System |
Type of Testing |
Note |
|
†Microsoft Windows* 2000 Advanced Server, Service Pack 3 |
Compatibility & Stress |
1 |
|
†Microsoft Small Business Server 2000 |
Install Only |
3 |
|
Microsoft Windows NT 4.0, Service Pack 6a |
Install Only |
|
|
†Novell Netware* 6.0, Service Pack 2 |
Compatibility & Stress |
1 |
|
†Novell Netware* 5.1, Support Pack 3 |
Basic Installation |
2 |
|
†Red Hat* Linux 8.0 |
Compatibility & Stress |
1 |
|
†Red Hat* Linux 7.3 |
Compatibility & Stress |
1 |
|
†Red Hat* Linux 7.2 |
Basic Installation |
2 |
|
†Caldera OpenUnix* 8.0, MP3 |
Compatibility & Stress |
1 |
|
†TurboLinux* 7 |
Compatibility & Stress |
1 |
|
For an expanded explanation of what level of testing was done, what type of configuration was used, support coverage and Operating System certification status, refer to the Tested Hardware and Operating System List.

† This link will take you off of the Intel Web site. Intel does not control the content of the destination Web Site.
Notes:
1. Adapter/Peripheral Compatibility and Stress testing is performed only on the most current release of a supported operating system at the time of a given validation run. The Adapter/Peripheral Compatibility and Stress testing process consists of three areas: Base Platform, Multiple Adapter, and Endurance:
Base Platform: Each base platform will successfully install a given operating system, successfully run a disk stress test, and successfully run a network stress test.
Multiple Adapters: Multiple adapter validation (MAV) testing uses configurations and test suites to gain an accurate view of how the server performs under varying complex configurations while interacting with network clients. Each configuration is tested for at least 12 hours.
Endurance Test: This test sequence uses configurations that include 2-6 add-in adapters (depending on chassis used) for a minimum 72-hour test run without injecting errors. Each configuration passes an installation test, a Network/Disk Stress test, and tape backup test. Any fatal errors that occur will require a complete test restart.
2. Basic installation testing is performed with each supported operating system. Basic installation testing validates that the server board can install the operating system and that the base hardware feature set is functional. A small set of peripherals is used for installation purposes only. No add-in adapter cards are tested. Testing may include network connectivity and running of proprietary and industry standard test suites.
3. Intel Server Board adapter/peripheral compatibility & stress testing was actually completed with Microsoft* Windows* 2000 Server. Intel server Board supports the operating system portion of Small Business Server only. The Application portion of Small Business Server is not tested or supported.
This applies to:
|